Administrator Robert Lightfoot, acting Deputy NASA Administrator Lesa Roe, Ames Center Director Eugene Tu, Ames Director of Science Michael Bicay, and Amoroso Construction Northern California Operations Manager Michael Chambers donned hard hats and used golden shovels to ceremonially begin construction on the building.

The Biosciences Collaborative Facility will be a two-story, 40,000-square-foot building housing wet chemistry laboratories designed with the latest technology to serve NASA's programs in fundamental space biology, astrobiology and bioengineering. The building's design provides open and reconfigurable lab spaces intended to increase interdisciplinary research.

The work conducted in this facility will help spur advances that minimize risks in human deep space exploration, and inform the design of future NASA missions and our search for microbial life in our solar system.

Tweet


Study finds that gravity, 'mechanical loading' are key to cartilage development

Mechanical loading, or forces that stimulate cellular growth for development, is required for creating cartilage that is then turned to bone; however, little is known about cartilage development in the absence of gravity or mechanical loads.

Now, in a study led by the University of Missouri, bioengineers have determined that microgravity may inhibit cartilage formation. Findings reveal tha … read more